M-1 · Light Manufacturing
Zillah, WA · ZMC 17.14.010(G); 17.18.020 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Temporary homeless encampments | — | — | — | — | |
| Secure community transition facilities | — | — | — | — | HomeH ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | n/a. Except when the city, upon examination of the street improvements and right-of-way width, determines that a setback is necessary to provide for a minimum five-foot-wide sidewalk. ZMC 17.18.020 | |
| Side setback | ||
| Rear setback | ||
| Maximum height | 50 ft ZMC 17.18.020 | |
| Minimum parking | Adequate on-site parking shall be provided for the homeless encampment. No off-site parking will be allowed. ZMC 17.73.080(A)(7) | The parking requirement for any use not listed above shall be established by the city based on the requirement for the listed uses deemed to be most comparable in terms of parking demand or on standards in the building code. ZMC 17.22.020(I)(5)
for Secure community transition facilities (group living) |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Administrative subdivision (four or fewer lots) ZMC 17.25.010; 17.25.020; 17.06.020 | A | up to 4 ZMC 17.25.010 | — | Minimum lot width 25 ft ZMC 17.18.020 Minimum frontage Not set ZMC 17.18.020 |
| Short subdivision preliminary plats (five to nine lots) ZMC 17.26.030; 17.06.020; 17.06.040 | H | 5 to 9 ZMC 17.26.030 | — | Minimum lot width 25 ft ZMC 17.18.020 Minimum frontage Not set ZMC 17.18.020 |
| Subdivisions (10 or more lots) and long plats ZMC 17.26.040; 17.06.020; 17.06.050 | H | 10 or more ZMC 17.26.040 | — | Minimum lot width 25 ft ZMC 17.18.020 Minimum frontage Not set ZMC 17.18.020 |
| Commercial site development plan ZMC 17.32.020; 17.32.040; 17.06.020; 17.06.040 | H | 2 or more ZMC 17.32.030(A) | — | Minimum lot width 25 ft ZMC 17.18.020 Minimum frontage Not set ZMC 17.18.020 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- None of these is true:
- The site is within a sensitive/critical area or its buffer as defined in the Zillah Municipal Code
- The lot is not served by public sewer
- None of these is true:
- The lot is not served by public sewer
- The property abuts a residential zone with an intervening street or alley
- None of these is true:
- The property abuts a residential zone with an intervening street or alley
- The rear lot line is along a public or private right-of-way
- All of these are true:
- The property abuts a residential district with no intervening street or alley
- The rear lot line is along a public or private right-of-way
- None of these is true:
- The rear lot line is along a public or private right-of-way
- The property abuts a residential district with no intervening street or alley