Sign in

AO · Airport Operations District

Whatcom County, WA · WCC 20.70 · Official code

By right: nothing · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Secure community transition facility————
Home✓1 ADU—
Mental health facilities————
HomeH2 ADU—
Substance use disorder treatment facilities————
HomeH2 ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot sizeThe minimum lot size shall be consistent with the area required to meet the building setback, lot coverage, buffer, open space and development standards of this district. WCC 20.70.250
Maximum residentsNot set WCC 20.70
3 persons WCC 20.66.094(2)
for Secure community transition facility (group living)1

3. Building standards

StandardValueExceptions
Front setback
  • 30 ft3 WCC 20.80.210(5)(b)
  • 30 ft4 WCC 20.80.210(5)(b)
  • 30 ft5 WCC 20.80.210(5)(b)
  • 30 ft6 WCC 20.80.210(5)(b)
  • 20 ft7 WCC 20.80.210(5)(b)
Side setback
  • 200 ft8 WCC 20.70.550; 20.80.254(4)(a)
  • 10 ft9 WCC 20.80.210(5)(b)
Street side setbackYards on the other flanking roads may be considered side yards except that for collectors or arterials the minimum setback shall be no less than one-half of the road setback required for the road type in WCC § 20.80.210. WCC 20.80.230(3)
Rear setback
  • 200 ft8 WCC 20.70.550; 20.80.254(4)(a)
  • 10 ft9 WCC 20.80.210(5)(b)
Maximum heightHeight of structures shall be consistent with the general requirement of WCC § 20.80.675. WCC 20.70.400
Maximum lot coverage50% WCC 20.70.450
Minimum parkingParking spaces for other permitted or conditional uses not listed in this section shall be determined by the director or hearing examiner, whichever has jurisdiction for the permit applied for. WCC 20.80.590(1)
Minimum open space25% WCC 20.70.500

4. ADU standards

Lot

No standards.

Building

No standards.

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision WCC 21.04.034 A up to 4 WCC 21.10.020 —
Minimum lot size
The minimum lot size shall be consistent with the area required to meet the building setback, lot coverage, buffer, open space and development standards of this district. WCC 20.70.250
Minimum frontage
Not set WCC 20.70.250
Subdivision (long subdivision) WCC 21.05.037 H 5 or more WCC 21.10.020 —
Minimum lot size
The minimum lot size shall be consistent with the area required to meet the building setback, lot coverage, buffer, open space and development standards of this district. WCC 20.70.250
Minimum frontage
Not set WCC 20.70.250
Binding site plan WCC 21.07.020(1); 21.07.030; 21.07.110(2) H — —
Minimum lot size
The minimum lot size shall be consistent with the area required to meet the building setback, lot coverage, buffer, open space and development standards of this district. WCC 20.70.250
Minimum frontage
Not set WCC 20.70.250
Exempt land division WCC 21.01.040(2)(b); 21.03.040 A — —
Minimum lot size
871,200 sq ft WCC 21.01.040(2)(b)
Minimum frontage
Not set WCC 20.70.250

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. All of these are true:
    • No other secure community transition facility is located within Whatcom County
    None of these is true:
    • Lot is within the Cherry Point Major Port Industrial Urban Growth Area
    • The site is adjacent to an existing risk potential facility (public or private school, school bus stop, licensed day care or preschool, public park, publicly dedicated trail, sports field, playground, recreational or community center, church, synagogue, temple or mosque, public library, youth camp, or other use identified by DSHS)
    • The site is immediately across the street or parking lot from an existing risk potential facility
    • The site is within the line of sight (an unobstructed visual distance of 600 feet, unless visual barriers screen it) of an existing risk potential facility
  2. The facility provides crisis care (evaluation, emergency treatment and residential stabilization of a behavioral crisis)
  3. Classification of the road the front yard abuts: I-5, state highway, urban principal or minor arterial; urban collector arterial or rural major collector; minor collector; local access street; or minor access street (dead-end or loop street serving 16 or fewer lots) is highway_or_urban_arterial
  4. Classification of the road the front yard abuts: I-5, state highway, urban principal or minor arterial; urban collector arterial or rural major collector; minor collector; local access street; or minor access street (dead-end or loop street serving 16 or fewer lots) is urban_collector_or_rural_major_collector
  5. Classification of the road the front yard abuts: I-5, state highway, urban principal or minor arterial; urban collector arterial or rural major collector; minor collector; local access street; or minor access street (dead-end or loop street serving 16 or fewer lots) is minor_collector
  6. Classification of the road the front yard abuts: I-5, state highway, urban principal or minor arterial; urban collector arterial or rural major collector; minor collector; local access street; or minor access street (dead-end or loop street serving 16 or fewer lots) is local_access
  7. Classification of the road the front yard abuts: I-5, state highway, urban principal or minor arterial; urban collector arterial or rural major collector; minor collector; local access street; or minor access street (dead-end or loop street serving 16 or fewer lots) is minor_access
  8. The side or rear lot line adjoins an Urban Residential, Urban Residential Medium Density, Residential Rural or Rural District
  9. None of these is true:
    • The side or rear lot line adjoins an Urban Residential, Urban Residential Medium Density, Residential Rural or Rural District