Sign in

UR3 · Urban Residential 3

Tacoma, WA · TMC 13.06.020 · Official code

By right: 1 unit, 2 units, 3 units, 4+ units · ADU allowed by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Houseplex
Home✓ ADU✓
Home✓ ADU✓
Home✓ ADU✓
Home✓ ADU✓
—
Live/Work
Home✓ ADU✓
Home✓ ADU✓
Home✓ ADU✓
Home✓ ADU✓
—
Backyard Building—
Home✓ ADU✓
Home✓ ADU✓
Home✓ ADU✓
—
Courtyard Housing—
Home✓ ADU✓
Home✓ ADU✓
Home✓ ADU✓
—
Mobile home/trailer court—
HomeA ADU✓
HomeA ADU✓
HomeA ADU✓
—
Rowhouse——
Home✓ ADU✓
Home✓ ADU✓
—
Multiplex———
Home✓ ADU✓
—
Retirement home———
Home✓ ADU✓
—
Group housing————
Home✓ ADU✓
Special needs housing————
Home✓ ADU✓
Permanent shelter————
HomeA1 ADU✓1
Confidential shelter————
Home✓ ADU✓
Juvenile community facility————
HomeA2 ADU✓2
Temporary shelter————
HomeA3 ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Maximum unitsNot set TMC 13.06.020F.1
6 units TMC 13.01.060
for Houseplex (4+ units)
Minimum unitsNot set TMC 13.06.020F.1
7 units TMC 13.01.060
for Multiplex (4+ units)
Minimum lot size2,500 sq ft TMC 13.06.020F.1
Minimum lot width25 ft TMC 13.06.020F.1
Minimum frontage
  • 25 ft4 TMC 13.06.020F.1
  • 10 ft5 TMC 13.06.020F.1
Maximum density
  • 1 unit per 750 sq ft, ADUs included6 TMC 13.06.020F.1
  • 1 unit per the smallest of 750, lot area ÷ 8 sq ft, ADUs included7 TMC 13.06.020F.1
  • 1 unit per 500 sq ft, ADUs included8 TMC 13.06.020F.1
  • 1 unit per the smallest of 500, lot area ÷ 10 sq ft, ADUs included9 TMC 13.06.020F.1
  • 1 unit per 375 sq ft, ADUs included10 TMC 13.06.020F.1
  • 1 unit per the smallest of 375, lot area ÷ 8 sq ft, ADUs included11 TMC 13.06.020F.1
Not set TMC 13.06.020F.1
for Group housing (group living); Special needs housing (group living); Permanent shelter (group living)1; Confidential shelter (group living); Juvenile community facility (group living)2; Temporary shelter (group living)3
Maximum residentsNot set TMC 13.06.020F.1
No limit TMC 13.06.020E.4
for Group housing (group living)
8 persons TMC 13.06.080H.4.a
for Juvenile community facility (group living)2
the smallest of 100, lot area ÷ 150, rounded down persons TMC 13.06.080N.3.d(1); 13.06.080N.3.d(2)
for Temporary shelter (group living)3
Maximum bedsNot set TMC 13.06.020F.1
No limit TMC 13.06.020E.4
for Group housing (group living)
Maximum sleeping unitsNot set TMC 13.06.020F.1
No limit TMC 13.06.020E.4
for Group housing (group living)

3. Building standards

StandardValueExceptions
Front setback
  • 10 ft12 TMC 13.06.020F.1
  • 7.5 ft13 TMC 13.06.020F.3.b(2)
  • 7.5 ft14 TMC 13.06.020F.1
  • 5 ft15 TMC 13.06.020F.1
  • 5 ft16 TMC 13.06.020F.3.b(2)
Maximum front setback
  • 15 ft17 TMC 13.06.020F.1
  • Not set18 TMC 13.06.020F.1
Side setback
  • 5 ft19 TMC 13.06.020F.1
  • 8 ft20 TMC 13.06.020F.1
Rear setback
  • 10 ft12 TMC 13.06.020F.1
  • 7.5 ft13 TMC 13.06.020F.3.b(2)
  • 7.5 ft14 TMC 13.06.020F.1
  • 5 ft15 TMC 13.06.020F.1
  • 5 ft16 TMC 13.06.020F.3.b(2)
Building separation
  • 6 ft21 TMC 13.06.020F.1
  • 10 ft22 TMC 13.06.020F.1
  • 6 ft23 TMC 13.06.100F.6.a(4)(C)
  • 10 ft24 TMC 13.06.100F.6.a(4)(C)
for Houseplex (1, 2, 3, 4+ units); Backyard Building (2, 3, 4+ units); Courtyard Housing (2, 3, 4+ units); Rowhouse (3, 4+ units); Multiplex (4+ units)
Maximum height
  • 35 ft12 TMC 13.06.020F.1
  • 45 ft25 TMC 13.06.020F.3.a(2)
  • 45 ft26 TMC 13.06.020F.1
Maximum stories
  • 3 stories27 TMC 13.06.020F.1
  • 4 stories28 TMC 13.06.020F.1
  • 5 stories15 TMC 13.06.020F.1
Maximum floor area ratio
  • 129 TMC 13.06.020F.1
  • 1.230 TMC 13.06.020F.1
  • 1.628 TMC 13.06.020F.1
  • 215 TMC 13.06.020F.1
Minimum parking
  • 0 spaces per unit31 TMC 13.06.090C.3.j(4)(b)
  • 0 spaces per unit32 TMC 13.06.090C.3 Table 2 note 18
  • 0 spaces per unit33 TMC 13.06.090C.3.i
  • 0.5 spaces per unit34 TMC 13.06.090C.3 Table 1
0 spaces per unit TMC 13.06.080I.1.b(1)
for Live/Work (1, 2, 3, 4+ units)
  • 0 spaces per unit31 TMC 13.06.090C.3.j(4)(b)
  • 0 spaces per unit32 TMC 13.06.090C.3 Table 2 note 18
  • 0.5 spaces per sleeping unit35 TMC 13.06.090C.3 Table 1
for Group housing (group living)
  • 0 spaces per unit31 TMC 13.06.090C.3.j(4)(b)
  • (0.1 × beds in the project) + employees on the largest shift spaces36 TMC 13.06.090C.3 Table 1
for Special needs housing (group living); Permanent shelter (group living)1; Confidential shelter (group living); Temporary shelter (group living)3
1.2 × employees on the largest shift spaces TMC 13.06.090C.3 Table 1; 13.06.090C.3 Table 2 note 5
for Juvenile community facility (group living)2
Minimum open space5% TMC 13.06.020F.1
Maximum units per buildingNot set TMC 13.06.020F.1
6 units TMC 13.01.060
for Houseplex (1, 2, 3, 4+ units); Backyard Building (2, 3, 4+ units); Courtyard Housing (2, 3, 4+ units)

4. ADU standards

Lot

StandardValueExceptions
Maximum units2 units TMC 13.06.080A.4.a
Minimum lot sizeNo limit TMC 13.06.080A.5.a

Building

StandardValueExceptions
Front setback
  • 10 ft12 TMC 13.06.080A.5.d; 13.06.020F.1
  • 7.5 ft13 TMC 13.06.080A.5.d; 13.06.020F.3.b(2)
  • 7.5 ft14 TMC 13.06.080A.5.d; 13.06.020F.1
  • 5 ft15 TMC 13.06.080A.5.d; 13.06.020F.1
  • 5 ft16 TMC 13.06.080A.5.d; 13.06.020F.3.b(2)
Side setback
  • 5 ft19 TMC 13.06.080A.5.d; 13.06.020F.1
  • 8 ft20 TMC 13.06.080A.5.d; 13.06.020F.1
Rear setback
  • 10 ft12 TMC 13.06.080A.5.d; 13.06.020F.1
  • 7.5 ft13 TMC 13.06.080A.5.d; 13.06.020F.3.b(2)
  • 7.5 ft14 TMC 13.06.080A.5.d; 13.06.020F.1
  • 5 ft15 TMC 13.06.080A.5.d; 13.06.020F.1
  • 5 ft16 TMC 13.06.080A.5.d; 13.06.020F.3.b(2)
Maximum height
  • 35 ft12 TMC 13.06.080A.5.c; 13.06.020F.1
  • 45 ft25 TMC 13.06.080A.5.c; 13.06.020F.3.a(2)
  • 45 ft26 TMC 13.06.080A.5.c; 13.06.020F.1
Maximum stories
  • 3 stories27 TMC 13.06.080A.5.c; 13.06.020F.1
  • 4 stories28 TMC 13.06.080A.5.c; 13.06.020F.1
  • 5 stories15 TMC 13.06.080A.5.c; 13.06.020F.1
Minimum parking0 spaces per unit TMC 13.06.080A.4.d
Maximum unit size1,000 sq ft TMC 13.06.080A.5.b(1)
Attached to the main houseNot required TMC 13.06.080A.5.a

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision TMC 13.05.070H Table H; 13.04.090A A 2 to 9 TMC 13.05.070H Table H; TMC 13.01.040 —
Minimum lot size
2,500 sq ft TMC 13.06.020F.1
Minimum lot width
25 ft TMC 13.06.020F.1
Minimum frontage
  • 25 ft4 TMC 13.06.020F.1
  • 10 ft5 TMC 13.06.020F.1
Subdivision TMC 13.05.110B; 13.05.070H Table H H 10 or more TMC 13.01.040 —
Minimum lot size
2,500 sq ft TMC 13.06.020F.1
Minimum lot width
25 ft TMC 13.06.020F.1
Minimum frontage
  • 25 ft4 TMC 13.06.020F.1
  • 10 ft5 TMC 13.06.020F.1
Subdivision, unit lot TMC 13.04.093F; 13.05.070H Table HOnly for: Houseplex, Backyard Building, Courtyard Housing, Rowhouse, Mobile home/trailer court A 2 to 9 TMC 13.01.040 —
Minimum lot size
Deviation from setback, lot width, and lot area standards in TMC § 13.06.020 may be approved for individual unit lots through a unit lot subdivision, subject to any limitations in this section. TMC 13.04.093C
Subdivision, unit lot TMC 13.04.093F; 13.05.070H Table HOnly for: Houseplex, Backyard Building, Courtyard Housing, Rowhouse, Mobile home/trailer court H 10 or more TMC 13.01.040 —
Minimum lot size
Deviation from setback, lot width, and lot area standards in TMC § 13.06.020 may be approved for individual unit lots through a unit lot subdivision, subject to any limitations in this section. TMC 13.04.093C
Binding site plan TMC 13.05.070H Table H; 13.04.088BOnly for: Multiplex, Rowhouse, Courtyard Housing, Houseplex, Backyard Building A
Minimum lots
Not set TMC 13.04.088
—
Minimum lot size
Not set TMC 13.04.088

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. Any of these is true:
    • The emergency or transitional housing facility lawfully existed on the adoption date of TMC 13.06.080N.4
    • The lot line is 600 feet or more from the lot line of any other emergency and transitional housing
    • Existing proximity to a limited access highway or freeway affords comparable protection, so the 600 foot distance is waived
  2. The lot line is one-half mile or more from any other juvenile community facility
  3. None of these is true:
    • The site is in a critical area or its buffer
  4. None of these is true:
    • The lot is a pipestem lot whose access easement or lot extension is at least 10 feet wide
  5. The lot is a pipestem lot whose access easement or lot extension is at least 10 feet wide
  6. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    None of these is true:
    • The lot is a legal lot of record as of February 1, 2025
  7. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    • The lot is a legal lot of record as of February 1, 2025
  8. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier1
    None of these is true:
    • The lot is a legal lot of record as of February 1, 2025
  9. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier1
    • The lot is a legal lot of record as of February 1, 2025
  10. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier2
    None of these is true:
    • The lot is a legal lot of record as of February 1, 2025
  11. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier2
    • The lot is a legal lot of record as of February 1, 2025
  12. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is none
  13. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is one_tree
  14. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier1
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is one of none, one_tree
  15. Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier2
  16. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is one of none, tier1
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is grove
  17. The lot abuts a designated pedestrian street (TMC 13.06.010D)
  18. None of these is true:
    • The lot abuts a designated pedestrian street (TMC 13.06.010D)
  19. Any of these is true:
    • None of these is true:
      • Units in the building have their primary entrance facing that side yard
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is not none
  20. All of these are true:
    • Units in the building have their primary entrance facing that side yard
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is none
  21. Building height is at most 25
  22. Building height is more than 25
  23. Building height is less than 25
  24. Building height is at least 25
  25. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    • Which existing trees over 12 inches DBH the project retains for UR flexibility (none, at least one tree, or a tree grove) is not none
  26. Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is not none
  27. Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
  28. Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier1
  29. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    • Main dwelling units on the lot is at most 2
  30. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is none
    • Main dwelling units on the lot is at least 3
  31. The site is within the Urban Residential Reduced Parking Area (Figure 3)
  32. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is tier2
    None of these is true:
    • The site is within the Urban Residential Reduced Parking Area (Figure 3)
  33. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is not tier2
    • No alley is present to provide vehicular access to the rear of the site
    • Main dwelling units on the lot is at most 2
    None of these is true:
    • The site is within the Urban Residential Reduced Parking Area (Figure 3)
  34. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is not tier2
    • Not all of these are true:
      • No alley is present to provide vehicular access to the rear of the site
      • Main dwelling units on the lot is at most 2
    None of these is true:
    • The site is within the Urban Residential Reduced Parking Area (Figure 3)
  35. All of these are true:
    • Which UR District bonus tier the project earns (Tier 1: affordability or retaining an existing building; Tier 2: all units at deeper affordability) is not tier2
    None of these is true:
    • The site is within the Urban Residential Reduced Parking Area (Figure 3)
  36. None of these is true:
    • The site is within the Urban Residential Reduced Parking Area (Figure 3)