Sign in

S1A/N · S-1a Western Slope South Shoreline District

Tacoma, WA · TMC 19.09.010 · Official code

By right: nothing · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Dwelling, two-unit—
HomeA1 ADUA2
———
Dwelling, three-unit——
HomeA1 ADUA2
——
Multifamily – stand alone———
HomeA3 ADUA4
—
Multifamily as part of a mix-use development———
Home✓5 ADUA6
—
Group housing————
HomeA1 ADUA2

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum units4 units TMC 19.10.010
Minimum lot size6,000 sq ft TMC 19.09 Table 9-2
Minimum lot width50 ft TMC 19.09 Table 9-2
Minimum frontage25 ft TMC 19.09 Table 9-2

3. Building standards

StandardValueExceptions
Front setback20 ft TMC 19.09 Table 9-2
Side setback5 ft TMC 19.09 Table 9-2 note 31
Total side setbacks30% of shoreline frontage TMC 19.09 Table 9-2
Rear setback
  • 10 ft7 TMC 19.09 Table 9-2
  • Critical Area Buffer Setback from edge of buffer. When no buffer is present, the Setback is measured from the rear property line.8 TMC 19.09 Table 9-2
Maximum height
  • 35 ft9 TMC 19.09 Table 9-2
  • 75 ft10 TMC 19.09 Table 9-2
Minimum parking0 spaces per unit TMC 19.07.100B.1.b

4. ADU standards

Lot

No standards.

Building

StandardValueExceptions
Front setback20 ft TMC 19.09 Table 9-2; 19.09 Table 9-2
Side setback5 ft TMC 19.09 Table 9-2; 19.09 Table 9-2 note 31
Rear setback
  • 10 ft7 TMC 19.09 Table 9-2; 19.09 Table 9-2
  • Critical Area Buffer Setback from edge of buffer. When no buffer is present, the Setback is measured from the rear property line.8 TMC 19.09 Table 9-2; 19.09 Table 9-2
Maximum height
  • 35 ft9 TMC 19.09 Table 9-2; 19.09 Table 9-2
  • 75 ft10 TMC 19.09 Table 9-2; 19.09 Table 9-2
Minimum parking0 spaces per unit TMC 19.07.100B.1.b

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision TMC 13.05.070H Table H; 13.04.090A A 2 to 9 TMC 13.05.070H Table H; TMC 13.01.040 —
Minimum lot size
  • 5,000 sq ft11 TMC 19.09 Table 9-2
  • 6,000 sq ft12 TMC 19.09 Table 9-2
Minimum lot width
50 ft TMC 19.09 Table 9-2
Minimum frontage
25 ft TMC 19.09 Table 9-2
Subdivision TMC 13.05.110B; 13.05.070H Table H H 10 or more TMC 13.01.040 —
Minimum lot size
  • 5,000 sq ft11 TMC 19.09 Table 9-2
  • 6,000 sq ft12 TMC 19.09 Table 9-2
Minimum lot width
50 ft TMC 19.09 Table 9-2
Minimum frontage
25 ft TMC 19.09 Table 9-2
Binding site plan TMC 13.05.070H Table H; 13.04.088BOnly for: Multifamily as part of a mix-use development, Multifamily – stand alone A
Minimum lots
Not set TMC 13.04.088
—
Minimum lot size
Not set TMC 13.04.088

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. The site is in an upland location (not over-water or in-water)
  2. All of these are true:
    • The site is in an upland location (not over-water or in-water)
    • The site is in an upland location (not over-water or in-water)
  3. All of these are true:
    • The site is in an upland location (not over-water or in-water)
    • The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
    • Any of these is true:
      • Navigability is severely limited at the proposed site
      • The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
  4. All of these are true:
    • The site is in an upland location (not over-water or in-water)
    • The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
    • Any of these is true:
      • Navigability is severely limited at the proposed site
      • The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
    • The site is in an upland location (not over-water or in-water)
    • The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
    • Any of these is true:
      • Navigability is severely limited at the proposed site
      • The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
  5. All of these are true:
    • The site is in an upland location (not over-water or in-water)
    • The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
    • Any of these is true:
      • The use is part of a mixed-use proposal or facility that supports water-oriented uses
      • Navigability is severely limited at the proposed site
      • The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
  6. All of these are true:
    • The site is in an upland location (not over-water or in-water)
    • The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
    • Any of these is true:
      • The use is part of a mixed-use proposal or facility that supports water-oriented uses
      • Navigability is severely limited at the proposed site
      • The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
    • The site is in an upland location (not over-water or in-water)
    • The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
    • Any of these is true:
      • The use is part of a mixed-use proposal or facility that supports water-oriented uses
      • Navigability is severely limited at the proposed site
      • The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
  7. None of these is true:
    • A critical area buffer is present on the site
  8. A critical area buffer is present on the site
  9. Not all of these are true:
    • The site is upland and outside the marine shoreline buffer of TSMP Chapter 19.06 (Table 9-2 row for the district)
    • The project provides a view study
  10. All of these are true:
    • The site is upland and outside the marine shoreline buffer of TSMP Chapter 19.06 (Table 9-2 row for the district)
    • The project provides a view study
  11. The dwelling type the new lots are created for (single-unit detached, two-unit, three-unit or multi-unit dwellings) is single_unit
  12. The dwelling type the new lots are created for (single-unit detached, two-unit, three-unit or multi-unit dwellings) is not single_unit