Sign in

M1 · Light Industrial District

Tacoma, WA · TMC 13.06.060 · Official code

By right: 1 unit, 2 units, 3 units, 4+ units · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Live/Work
Home✓ ADU✓1
Home✓ ADU✓1
Home✓ ADU✓1
Home✓ ADU✓1
—
Work/Live
Home✓ ADU✓1
Home✓ ADU✓1
Home✓ ADU✓1
Home✓ ADU✓1
—
Multiplex———
Home✓2 ADU✓3
—
Retirement home———
Home✓4 ADU✓5
—
Group housing————
Home✓4 ADU✓5
Special needs housing————
Home✓1 ADU✓6
Permanent shelter————
Home✓1 ADU✓6
Confidential shelter————
Home✓1 ADU✓6
Temporary shelter————
Home✓1 A7 ADU—
Juvenile community facility————
Home✓8 ADU✓9
Work release center————
HomeA10 ADU✓11

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Maximum unitsNot set TMC 13.06.060E.5
20 units TMC 13.06.060E.5
for Live/Work (4+ units); Work/Live (4+ units)
Minimum unitsNot set TMC 13.06.060E.5
7 units TMC 13.01.060
for Multiplex (4+ units)2
Maximum residentsNot set TMC 13.06.060E.5
the smallest of 100, lot area ÷ 150, rounded down persons TMC 13.06.080N.3.d(1); 13.06.080N.3.d(2)
for Temporary shelter (group living)1; Temporary shelter (group living)7
16 persons TMC 13.06.080H.4.a
for Juvenile community facility (group living)8
25 persons TMC 13.06.080R.3.a
for Work release center (group living)10

3. Building standards

StandardValueExceptions
Front setback
  • 0 ft12 TMC 13.06.060F.4
  • Abutting a dwelling district, then equal to the dwelling district setback for the first 100 feet from that side.13 TMC 13.06.060F.4
Side setback0 ft TMC 13.06.060F.5
Rear setback0 ft TMC 13.06.060F.6
Building separation
  • 6 ft14 TMC 13.06.010H.4.a(2)
  • 10 ft15 TMC 13.06.010H.4.a(2)
  • 10 + (building stories − 6, rounded up) ft16 TMC 13.06.010H.4.a(3)
  • 10 + (2 × (building stories − 6, rounded up)) ft17 TMC 13.06.010H.4.a(3)
Maximum height75 ft TMC 13.06.060F.7
Maximum lot coverage75% TMC 13.06.060F.3
Minimum parking
  • 0 spaces per unit18 TMC 13.06.080I.1.b(1)
  • 1.25 spaces per unit19 TMC 13.06.090C.3 Table 1
1.25 spaces per unit TMC 13.06.090C.3 Table 1
for Multiplex (4+ units)2; Retirement home (4+ units)4
0.75 spaces per sleeping unit TMC 13.06.090C.3 Table 1
for Group housing (group living)4
(0.1 × beds in the project) + employees on the largest shift spaces TMC 13.06.090C.3 Table 1
for Special needs housing (group living)1; Permanent shelter (group living)1; Confidential shelter (group living)1; Temporary shelter (group living)1; Temporary shelter (group living)7
1.2 × employees on the largest shift spaces TMC 13.06.090C.3 Table 1; 13.06.090C.3 Table 2 note 5
for Juvenile community facility (group living)8; Work release center (group living)10
Minimum open spaceNot set TMC 13.06.060E.5
20% TMC 13.06.060H.1.a; 13.06.020G.7.e
for Multiplex (4+ units)2; Retirement home (4+ units)4

4. ADU standards

Lot

StandardValueExceptions
Maximum units2 units TMC 13.06.080A.4.a
Minimum lot sizeNo limit TMC 13.06.080A.5.a

Building

StandardValueExceptions
Front setback
  • 0 ft12 TMC 13.06.080A.5.d; 13.06.060F.4
  • Abutting a dwelling district, then equal to the dwelling district setback for the first 100 feet from that side.13 TMC 13.06.080A.5.d; 13.06.060F.4
Side setback0 ft TMC 13.06.080A.5.d; 13.06.060F.5
Rear setback0 ft TMC 13.06.080A.5.d; 13.06.060F.6
Maximum height75 ft TMC 13.06.080A.5.c; 13.06.060F.7
Minimum parking0 spaces per unit TMC 13.06.080A.4.d
Maximum unit size1,000 sq ft TMC 13.06.080A.5.b(1)
Attached to the main houseNot required TMC 13.06.080A.5.a

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision TMC 13.05.070H Table H; 13.04.090A A 2 to 9 TMC 13.05.070H Table H; TMC 13.01.040 —
Minimum lot size
Not set TMC 13.06.060F.1
Subdivision TMC 13.05.110B; 13.05.070H Table H H 10 or more TMC 13.01.040 —
Minimum lot size
Not set TMC 13.06.060F.1
Binding site plan TMC 13.05.070H Table H; 13.04.088B A
Minimum lots
Not set TMC 13.04.088
—
Minimum lot size
Not set TMC 13.04.088

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
  2. The dwellings are within a mixed-use building where at least 1/3 of the building is devoted to industrial or commercial use
  3. All of these are true:
    • The dwellings are within a mixed-use building where at least 1/3 of the building is devoted to industrial or commercial use
    None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
  4. All of these are true:
    • Any of these is true:
      • The use is within a residential or institutional building in existence on December 31, 2008
      • The dwellings are within a mixed-use building where at least 1/3 of the building is devoted to industrial or commercial use
    None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
  5. All of these are true:
    • Any of these is true:
      • The use is within a residential or institutional building in existence on December 31, 2008
      • The dwellings are within a mixed-use building where at least 1/3 of the building is devoted to industrial or commercial use
    None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
    • The site is within the South Tacoma M/IC Overlay District
  6. None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
    • The site is within the South Tacoma M/IC Overlay District
  7. The site is within the South Tacoma M/IC Overlay District
  8. All of these are true:
    • The lot line is one-half mile or more from any other juvenile community facility
    None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
  9. All of these are true:
    • The lot line is one-half mile or more from any other juvenile community facility
    None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
    • The site is within the South Tacoma M/IC Overlay District
  10. All of these are true:
    • The lot line is at least one-half mile from any other work release facility
    • The lot line is 600 feet or more from any residential zone, RCX zone, day care, church with day care, family day care, crisis care facility, special needs housing, school or public park
  11. All of these are true:
    • The lot line is at least one-half mile from any other work release facility
    • The lot line is 600 feet or more from any residential zone, RCX zone, day care, church with day care, family day care, crisis care facility, special needs housing, school or public park
    None of these is true:
    • The site is within the South Tacoma M/IC Overlay District
  12. None of these is true:
    • The lot abuts a residentially zoned property (the setback applies for the first 100 feet from that side)
  13. The lot abuts a residentially zoned property (the setback applies for the first 100 feet from that side)
  14. All of these are true:
    • Building height is at most 25
    • Building stories is at most 6
  15. All of these are true:
    • Building height is more than 25
    • Building stories is at most 6
  16. All of these are true:
    • Building stories is more than 6
    None of these is true:
    • Another building on the same site, adjacent to this one, also exceeds six stories
  17. All of these are true:
    • Building stories is more than 6
    • Another building on the same site, adjacent to this one, also exceeds six stories
  18. The live/work or work/live units are within a building lawfully in existence prior to December 5, 1989
  19. None of these is true:
    • The live/work or work/live units are within a building lawfully in existence prior to December 5, 1989