BG · Business District, General
Sumas, WA · SMC 20.40 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Single-family dwelling | — | — | — | — | |
| Dwelling units above the first story | — | ||||
| Duplex | — | HomeH ADU— | — | — | — |
| Multiple dwellings / multifamily dwellings | — | — | HomeH ADU— | HomeH ADU— | — |
| Boarding house | — | — | — | — | HomeH ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 9 units SMC 20.40.030(7) | Not set SMC 20.40
for Dwelling units above the first story (4+ units)2 |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum parking | 3 spaces per unit SMC 20.56.060(1)(A) | Not set SMC 20.56.060
for Boarding house (group living) |
4. ADU standards
Lot
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 2 units SMC 20.55.030; 20.55.030(1) |
Building
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | 8 ft SMC 20.55.070; 20.32.070 | |
| Rear setback | 5 ft SMC 20.55.070; 20.32.060 | |
| Maximum height | A D-ADU may not exceed a roof height of thirty-five feet when measured from the bottom of the foundation, or that of the PDU, whichever is lower. An A-ADU may not exceed the roof height of the PDU, unless the A-ADU is converted from an existing structure. SMC 20.55.060 | |
| Minimum parking | ||
| Maximum unit size | 1,000 sq ft SMC 20.55.030(4) | |
| Attached to the main house | Not required SMC 20.55.030(1)(A)-(C); 20.55.020 |
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision SMC 20.88.010; 20.08.050(2) | A | up to 4 SMC 20.84.040(b); 20.86.370 | — | Minimum lot size Not set SMC 20.88.060(b); 20.40 Maximum lot size Not set SMC 20.88.060 Minimum lot width Not set SMC 20.40 Minimum lot depth Not set SMC 20.40 Minimum frontage Not set SMC 20.88.060(a) Maximum units per lot Not set SMC 20.88.060 |
| Preliminary plat (long subdivision) SMC 20.90.010; 20.08.050(3) | H | 5 or more SMC 20.84.040(b); 20.90.010 | — | Minimum lot size Not set SMC 20.96.030; 20.40 Maximum lot size Not set SMC 20.96.030 Minimum lot width 60 ft SMC 20.96.030 Minimum lot depth Not set SMC 20.40 Minimum frontage Not set SMC 20.96.030; 20.40 Maximum units per lot Not set SMC 20.96.030 |
| Binding site plan SMC 20.94.020(b); 20.94.030(a); 20.08.050(3) | H7 | Maximum lots Not set SMC 20.94 |
— | Minimum lot size Not set SMC 20.94 Maximum lot size Not set SMC 20.94 Minimum lot width Not set SMC 20.94 Minimum lot depth Not set SMC 20.94 Minimum frontage Not set SMC 20.94 Maximum units per lot Not set SMC 20.94 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The property is connected to and served by public sewer
- The dwelling units are above the first story in a building housing a primary permitted use
- The lot is in an older area where fifty percent or more of the lots in the block are developed
- None of these is true:
- The lot is in an older area where fifty percent or more of the lots in the block are developed
- Lot area is at most 6,000 sf
- Lot area is more than 6,000 sf
- Purpose of the land division: sale, lease or transfer for commercial and industrial uses; lease where no residential structures other than mobile homes or travel trailers are permitted; condominium ownership under RCW 64.32; or other is one of commercial_industrial, lease_no_residential, condominium