Sign in

A-10 · Agriculture-10 Acre

Snohomish County, WA · SCC 30.21.025(3)(c); 30.22.110; 30.23.030 · Official code

By right: 1 unit, 2 units · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Dwelling, Single Family
Home✓ ADU✓1 ✓2
————
Dwelling, Mobile Home
Home✓ ADU✓1 ✓2
————
Farm Workers Dwelling
Home✓3 ADU—
————
Temporary Dwelling During Construction
HomeA4 ADU—
————
Temporary Dwelling for Relative
HomeA5 ADU—
————
Dwelling, Duplex—
Home✓ ADU—
———
Boarding House————
Home✓ ADU—
Foster Home————
Home✓ ADU✓1 ✓2

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot size435,600 sq ft SCC 30.23.030
871,200 sq ft SCC 30.22.130(10)(c)
for Farm Workers Dwelling (1 unit)3
Minimum lot widthNo limit SCC 30.23.030
Maximum residents2 persons SCC 30.22.130(15)
  • 6 persons6 SCC 30.91F.500
  • 3 persons7 SCC 30.91F.500
for Foster Home (group living)

3. Building standards

StandardValueExceptions
Front setback
  • 20 ft8 SCC 30.23.045; 30.23.049(3)
  • 50 ft9 SCC 30.23.045; 30.23.049(4)
Side setback
  • 5 ft10 SCC 30.23.030
  • 50 ft11 SCC 30.23.030; 30.32B.130(1)
  • 100 ft12 SCC 30.23.030; 30.32B.130(2)
  • 100 ft13 SCC 30.23.030; 30.32A.110(1)
  • 25 ft14 SCC 30.23.030; 30.23.040(12)
Street side setback
  • 20 ft8 SCC 30.23.045; 30.23.049(3)
  • 50 ft9 SCC 30.23.045; 30.23.049(4)
Rear setback
  • 5 ft10 SCC 30.23.030
  • 50 ft11 SCC 30.23.030; 30.32B.130(1)
  • 100 ft12 SCC 30.23.030; 30.32B.130(2)
  • 100 ft13 SCC 30.23.030; 30.32A.110(1)
  • 25 ft14 SCC 30.23.030; 30.23.040(12)
Building separationNot set SCC 30.23.030
20 ft SCC 30.22.130(18)(f)
for Temporary Dwelling for Relative (1 unit)5
Maximum height45 ft SCC 30.23.030
Maximum lot coverageNo limit SCC 30.23.030
Minimum parking2 spaces per unit SCC 30.26.030
Farm Worker Dwelling | See SCC 30.26.035 | See SCC 30.26.035 SCC 30.26.030; 30.26.035
for Farm Workers Dwelling (1 unit)3
1 space per unit SCC 30.26.030
for Temporary Dwelling During Construction (1 unit)4; Temporary Dwelling for Relative (1 unit)5
1 space per sleeping unit SCC 30.26.030
for Boarding House (group living)
Where the parking requirements for a use are not specifically defined in SCC Table 30.26.030(1), the department shall determine the parking requirements for the use. SCC 30.26.030; 30.26.035
for Foster Home (group living)
Maximum unit sizeNot set SCC 30.23.030
1,200 sq ft SCC 30.22.130(10)(e)
for Farm Workers Dwelling (1 unit)3

4. ADU standards

Lot

StandardValueExceptions
Maximum units1 unit SCC 30.28.010(3)(a)

Building

StandardValueExceptions
Front setback
  • 20 ft8 SCC 30.23.045; 30.23.049(3)
  • 50 ft9 SCC 30.23.045; 30.23.049(4)
Side setback
  • 5 ft10 SCC 30.23.030
  • 50 ft11 SCC 30.23.030; 30.32B.130(1)
  • 100 ft12 SCC 30.23.030; 30.32B.130(2)
  • 100 ft13 SCC 30.23.030; 30.32A.110(1)
  • 25 ft14 SCC 30.23.030; 30.23.040(12)
Rear setback
  • 5 ft10 SCC 30.23.030
  • 50 ft11 SCC 30.23.030; 30.32B.130(1)
  • 100 ft12 SCC 30.23.030; 30.32B.130(2)
  • 100 ft13 SCC 30.23.030; 30.32A.110(1)
  • 25 ft14 SCC 30.23.030; 30.23.040(12)
Maximum height45 ft SCC 30.23.030
Minimum parking1 space per unit SCC 30.26.030; 30.28.010(1)(f)
Maximum unit size1,200 sq ft SCC 30.28.010(1)(e)
Attached to the main houseRequired SCC 30.28.010(3)(a)(i)
Not required SCC 30.28.010(3)(a)(i)
for Dwelling, Single Family (1 unit)2; Dwelling, Mobile Home (1 unit)2; Foster Home (group living)2

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision SCC 30.41B.030(1); 30.70.025 A15 up to 4 SCC 30.91S.280; 30.41B.010(1)(a) —
Minimum lot size
435,600 sq ft SCC 30.23.030
Short subdivision SCC 30.41B.030(1); 30.70.025 H16 up to 4 SCC 30.91S.280; 30.41B.010(1)(a) —
Minimum lot size
435,600 sq ft SCC 30.23.030
Subdivision SCC 30.41A.040(1); 30.70.025 H 5 or more SCC 30.91S.710; 30.41A.010(1)(a) —
Minimum lot size
435,600 sq ft SCC 30.23.030
Homestead parcel SCC 30.22.110; 30.22.130(40); 30.28.055(6) H17 up to 2 SCC 30.28.055(2); 30.28.055(4) —
Minimum lot size
The resultant non-homestead parcel shall not be less than the minimum lot area permitted in the zone SCC 30.28.055(2)
Maximum lot size
The homestead parcel shall include no more than two acres of land, unless soil conditions, topography, or other unique circumstances require a greater land area SCC 30.28.055(4)
Binding site plan SCC 30.41D.010(2); 30.70.025 A18
Maximum lots
Not set SCC 30.41D.010
—
Minimum lot size
Not set SCC 30.41D.010

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. Lot area is less than 435,600 sf
  2. Lot area is at least 435,600 sf
  3. All of these are true:
    • At least one person residing in the farm worker dwelling is employed full time in the farm operation
    • The farm worker dwelling is built within a farm building cluster which includes a farmhouse
  4. The housing is for employees of an isolated industrial, mining, highway, or utilities construction project, who occupy it on a seasonal basis for 180 days or less in any 12-month period
  5. All of these are true:
    • A permanent dwelling (existing residence) is on the same lot
    • The temporary dwelling is occupied only by a relative, by blood or marriage, of the occupant(s) of the permanent dwelling
    • The relative receives from, or administers to, the occupant of the other dwelling continuous care and assistance necessitated by advanced age or infirmity
    • The need for continuous care and assistance is attested to in writing by a licensed physician
    None of these is true:
    • The temporary dwelling is used as a commercial rental unit
    • A detached accessory dwelling unit is located on the lot
  6. None of these is true:
    • The foster home cares for expectant mothers rather than foster children
  7. The foster home cares for expectant mothers rather than foster children
  8. Not all of these are true:
    • The road network element in front of the lot is a public road
    • Width of the street right-of-way in front of the lot is less than 60
    • None of these is true:
      • The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
  9. All of these are true:
    • The road network element in front of the lot is a public road
    • Width of the street right-of-way in front of the lot is less than 60
    None of these is true:
    • The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
  10. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is one of commercial_industrial_zone, r_single_family_zone, other_urban_residential_zone, rural_zone, other_zone
  11. All of these are true:
    • What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_farmland
    • The lot itself is designated farmland (riverway commercial, upland commercial or local commercial farmland on the comprehensive plan)
  12. All of these are true:
    • What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_farmland
    None of these is true:
    • The lot itself is designated farmland (riverway commercial, upland commercial or local commercial farmland on the comprehensive plan)
  13. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_forest_land
  14. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is water_body
  15. None of these is true:
    • The short subdivision proposes a new public road or public road extension
  16. The short subdivision proposes a new public road or public road extension
  17. All of these are true:
    • The parcel is designated as agricultural land of primary or secondary significance in the Snohomish County Agricultural Preservation Plan or as agriculture in an adopted subarea comprehensive plan
    • A dwelling currently exists on the parcel and existed before the effective date of the homestead parcel provisions
  18. What the binding site plan divides the land for: sale or lease of commercial or industrial zoned land used for commercial or industrial purposes; lease as a mobile home park or recreational vehicle park; a condominium or horizontal property regime; special purpose tracts of a PRD; or other (for example commercial or industrial zoned land used only for residential purposes) is one of mobile_home_or_rv_park_lease, condominium