C1-75 · Commercial 1 with a 75-foot height limit
Seattle, WA · SMC 23.47A · Official code
By right: 1 unit, 2 units, 3 units, 4+ units · ADU allowed by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Housing | Home✓ ADU✓ | Home✓ ADU✓ | Home✓ ADU✓ | Home✓ ADU✓ | — |
| Artist's studio/dwelling | Home✓ ADU— | Home✓ ADU— | Home✓ ADU— | Home✓ ADU— | — |
| Permanent supportive housing | Home✓ ADU— | Home✓ ADU— | Home✓ ADU— | Home✓ ADU— | — |
| Mobile home | Home✓ ADU— | — | — | — | — |
| Caretaker's quarters | — | — | — | — | |
| Congregate residence | — | — | — | — | Home✓ ADU— |
| Assisted living facility | — | — | — | — | Home✓ ADU— |
| Nursing home | — | — | — | — | Home✓ ADU— |
| Adult family home | — | — | — | — | Home✓ ADU✓ |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
No standards.
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback |
|
|
| Maximum front setback | 10 ft SMC 23.47A.008(A)(1); 23.47A.008(A)(3) | |
| Side setback |
|
|
| Rear setback |
|
|
| Maximum height | ||
| Maximum floor area ratio | ||
| Minimum parking | 0 spaces per unit SMC 23.54.015 Table B row L
for Permanent supportive housing (1, 2, 3, 4+ units)
for Mobile home (1 unit) for Congregate residence (group living) 0 spaces per bed SMC 23.54.015 Table B row B
for Assisted living facility (group living); Nursing home (group living) | |
| Maximum unit size | Not set SMC 23.47A.013 | 800 sq ft SMC 23.84A.032
for Caretaker's quarters (1 unit)1 |
4. ADU standards
Lot
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 2 units SMC 23.42.022(C) |
Building
| Standard | Value | Exceptions |
|---|---|---|
| Front setback |
|
|
| Side setback |
|
|
| Rear setback |
|
|
| Maximum height | ||
| Minimum parking | 0 spaces per unit SMC 23.42.022(I); 23.54.015 Table B | |
| Maximum unit size | ||
| Attached to the main house | Not required SMC 23.42.022(D) |
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision SMC 23.76.004 Table A; 23.24.050 | A | up to 9 SMC 23.84A.036 | — | Minimum lot width 10 ft SMC 23.24.040(A)(9)(b) |
| Subdivision SMC 23.76.004 Table A; 23.76.024 | H | 10 or more SMC 23.84A.036 | — | Minimum lot width 10 ft SMC 23.22.100(C)(3)(b) |
| Short subdivision, zero lot line SMC 23.76.004 Table A; 23.24.045Only for: Housing | A | up to 9 SMC 23.84A.036 | — | Minimum lot size Not set SMC 23.24.045(B) |
| Subdivision, zero lot line SMC 23.76.004 Table A; 23.22.062Only for: Housing | H | 10 or more SMC 23.84A.036 | — | Minimum lot size Not set SMC 23.22.062(B) |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The dwelling unit is occupied by a caretaker or watchperson and is accessory to a nonresidential use on the lot
- Lot abuts the intersection of a side lot line and front lot line of a lot in a residential zone
- None of these is true:
- Lot abuts the intersection of a side lot line and front lot line of a lot in a residential zone
- A rear or side lot line abuts, or is across an alley from, a lot in a neighborhood residential zone (or a lot zoned both commercial and neighborhood residential that is less than 50 percent commercial)
- All of these are true:
- Any of these is true:
- A rear or side lot line abuts a lot or portion of a lot in an LR, MR, or HR zone
- A rear or side lot line abuts a portion of a lot that is zoned commercial
- A rear or side lot line abuts, or is across an alley from, a lot in a neighborhood residential zone (or a lot zoned both commercial and neighborhood residential that is less than 50 percent commercial)
- Any of these is true:
- None of these is true:
- A rear or side lot line abuts, or is across an alley from, a lot in a neighborhood residential zone (or a lot zoned both commercial and neighborhood residential that is less than 50 percent commercial)
- A rear or side lot line abuts a lot or portion of a lot in an LR, MR, or HR zone
- A rear or side lot line abuts a portion of a lot that is zoned commercial
- The development meets Section 23.42.055 (affordable units on property owned or controlled by a religious organization) and uses the zone's standards for such development
- None of these is true:
- The development meets Section 23.42.055 (affordable units on property owned or controlled by a religious organization) and uses the zone's standards for such development
- All of these are true:
- The development meets Section 23.42.055 (affordable units on property owned or controlled by a religious organization) and uses the zone's standards for such development
- Building height is at most 75
- All of these are true:
- The development meets Section 23.42.055 (affordable units on property owned or controlled by a religious organization) and uses the zone's standards for such development
- Building height is more than 75
- All of these are true:
- Lot is within a Station Area Overlay District
- The development meets Section 23.42.055 (affordable units on property owned or controlled by a religious organization) and uses the zone's standards for such development
- None of these is true:
- The development meets Section 23.42.055 (affordable units on property owned or controlled by a religious organization) and uses the zone's standards for such development
- Lot is within a Station Area Overlay District
- Any of these is true:
- Lot is inside a regional center or an urban center (Seattle Comprehensive Plan)
- Lot is within a Station Area Overlay District
- Lot is within a major transit service area (map adopted by Director's rule)
- All of these are true:
- Floor area of one unit is less than 1,200
- Lot is inside a regional center or an urban center (Seattle Comprehensive Plan)
- Lot is within a Station Area Overlay District
- Lot is within a major transit service area (map adopted by Director's rule)
- All of these are true:
- Floor area of one unit is at least 1,200
- Lot is inside a regional center or an urban center (Seattle Comprehensive Plan)
- Lot is within a Station Area Overlay District
- Lot is within a major transit service area (map adopted by Director's rule)
- Any of these is true:
- Lot is inside a regional center or an urban center (Seattle Comprehensive Plan)
- Lot is within a Station Area Overlay District
- Lot is within a major transit service area (map adopted by Director's rule)
- Lot is within a frequent transit service area (map adopted by Director's rule)
- All of these are true:
- Floor area of all units is less than 1,200
- Lot is inside a regional center or an urban center (Seattle Comprehensive Plan)
- Lot is within a Station Area Overlay District
- Lot is within a major transit service area (map adopted by Director's rule)
- Lot is within a frequent transit service area (map adopted by Director's rule)
- All of these are true:
- Floor area of all units is at least 1,200
- Lot is inside a regional center or an urban center (Seattle Comprehensive Plan)
- Lot is within a Station Area Overlay District
- Lot is within a major transit service area (map adopted by Director's rule)
- Lot is within a frequent transit service area (map adopted by Director's rule)
- Bedrooms in one ADU is at most 2
- Bedrooms in one ADU is at least 3
- The new lot is proposed with street frontage
- None of these is true:
- The new lot is proposed with street frontage