RAC · Rural Activity Center
Pierce County, WA · PCC 18A.10.090(A)(2)(a) · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Mobile Home | — | — | — | — | |
| Detached Single-Family Housing | — | — | — | — | |
| Duplexes | — | — | — | — | |
| Senior Housing Level 2 | — | — | — | — | |
| Multi-Family Housing Level 1 | — | — | — | — | |
| Multi-Family Housing Level 2 | — | — | — | — | |
| Group Home | — | — | — | — | |
| Residential Care Facility Level 1 | — | — | — | — | Home✓ ADU— |
| Residential Care Facility Level 2 | — | — | — | — | Home✓ ADU— |
| Senior Housing Level 1 | — | — | — | — | |
| Employee Housing | — | — | — | — | HomeH ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum units | Not set PCC 18A.33.210 | 6 units PCC 18A.33.210(D)
for Multi-Family Housing Level 1 (4+ units)3 |
| Minimum lot size | Not set PCC Table 18A.15.020-2 |
for Detached Single-Family Housing (1 unit)1 |
| Minimum density | Not set PCC Table 18A.15.020-2 | No limit PCC 18A.33.270(H)
for Employee Housing (group living) |
| Maximum density |
|
for Detached Single-Family Housing (1 unit)1 The densities for senior and assisted-living centers shall be based upon the requirements of the Health Department. PCC 18A.15.020(A)(7)(c)
Not set PCC 18A.15.020
No limit PCC 18A.33.270(H)
for Employee Housing (group living) |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback |
|
|
| Side setback |
|
|
| Street side setback | ||
| Rear setback | ||
| Maximum height | 45 ft PCC Table 18A.15.040-3 | |
| Minimum parking | 2 spaces per unit PCC Table 18A.35.040-1
(beds in the project ÷ 4) + (employees on the largest shift ÷ 2) spaces PCC Table 18A.35.040-1
for Residential Care Facility Level 1 (group living); Residential Care Facility Level 2 (group living) 1 per 2 units plus 1 per resident manager unit PCC Table 18A.35.040-1
for Employee Housing (group living) | |
| Maximum units per building | Not set PCC 18A.33.210 | 2 units PCC 18A.33.210(G)
for Duplexes (2 units)1 |
4. ADU standards
Lot
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 1 unit PCC 18A.37.120(A)(1) |
Building
| Standard | Value | Exceptions |
|---|---|---|
| Front setback |
|
|
| Side setback | ||
| Rear setback | ||
| Maximum height | 45 ft PCC 18A.37.120(A)(5); Table 18A.15.040-3 | |
| Minimum parking | ||
| Maximum unit size | 1,250 sq ft PCC 18A.37.120(B) | |
| Attached to the main house | Not required PCC 18A.37.120(A)(2) |
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Subdivision PCC 18F.40.020 | ✓ | — |
|
Minimum lot size Not set PCC Table 18A.15.020-2 Minimum lot width Not set PCC Table 18A.15.020-2 |
| Short subdivision PCC 18F.50.040(E) | A | — |
|
Minimum lot size Not set PCC Table 18A.15.020-2 Minimum lot width Not set PCC Table 18A.15.020-2 |
| Large lot division PCC 18F.50.040(E) | A | — |
|
Minimum lot size Not set PCC Table 18A.15.020-2 Minimum lot width Not set PCC Table 18A.15.020-2 |
| Binding Site Plan PCC 18F.60.030(B); 18F.60.030(D) | A50 | — |
|
Minimum lot size Not set PCC 18F.60.030 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The community plan area the lot is in (outside means not in an adopted community plan area) is one of gig_harbor_peninsula, key_peninsula, outside
- All of these are true:
- The community plan area the lot is in (outside means not in an adopted community plan area) is one of gig_harbor_peninsula, key_peninsula, outside
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is none
- The community plan area the lot is in (outside means not in an adopted community plan area) is key_peninsula
- All of these are true:
- The community plan area the lot is in (outside means not in an adopted community plan area) is key_peninsula
- Dwelling units are in a mixed-use building above nonresidential activity on the first floor
- All of these are true:
- The community plan area the lot is in (outside means not in an adopted community plan area) is one of gig_harbor_peninsula, key_peninsula, outside
- The housing will be occupied by persons who qualify as handicapped under the Federal Fair Housing Act
- The community plan area the lot is in (outside means not in an adopted community plan area) is graham
- All of these are true:
- The community plan area the lot is in (outside means not in an adopted community plan area) is one of gig_harbor_peninsula, key_peninsula, outside
- The housing will be occupied by persons who qualify as handicapped under the Federal Fair Housing Act
- The lot was legally created
- None of these is true:
- The lot was legally created
- All of these are true:
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is low_income_rental
- The lot is in the Purdy Rural Activity Center
- All of these are true:
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is low_income_owner_occupied
- The lot is in the Purdy Rural Activity Center
- All of these are true:
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is none
- The lot is in the Purdy Rural Activity Center
- All of these are true:
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is none
- The lot is in the Purdy Rural Activity Center
- All of these are true:
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is none
- The lot was legally created
- The lot is in the Purdy Rural Activity Center
- All of these are true:
- Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is none
- The lot is in the Purdy Rural Activity Center
- The lot was legally created
- All of these are true:
- The lot is a pipestem lot, or its only access is a shared access facility
- Lot area is at most 21,780 sf
- All of these are true:
- The lot is a pipestem lot, or its only access is a shared access facility
- Lot area is more than 21,780 sf
- All of these are true:
- A principal building has been established on an adjacent lot within the required front yard
- The lot is a pipestem lot, or its only access is a shared access facility
- The adjacent lot has received a reduced setback based upon a discretionary land use approval
- All of these are true:
- Not all of these are true:
- A principal building has been established on an adjacent lot within the required front yard
- None of these is true:
- The adjacent lot has received a reduced setback based upon a discretionary land use approval
- The lot is a pipestem lot, or its only access is a shared access facility
- Not all of these are true:
- All of these are true:
- Not all of these are true:
- A principal building has been established on an adjacent lot within the required front yard
- None of these is true:
- The adjacent lot has received a reduced setback based upon a discretionary land use approval
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The lot is a pipestem lot, or its only access is a shared access facility
- Not all of these are true:
- All of these are true:
- Not all of these are true:
- A principal building has been established on an adjacent lot within the required front yard
- None of these is true:
- The adjacent lot has received a reduced setback based upon a discretionary land use approval
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- Not all of these are true:
- All of these are true:
- The lot is an existing lot of record
- Lot width is at most 100 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- The lot is an existing lot of record
- Lot width is more than 100 ft
- Lot width is at most 150 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- The lot is an existing lot of record
- Lot width is more than 150 ft
- Lot width is at most 200 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- Not all of these are true:
- The lot is an existing lot of record
- Lot width is at most 200 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- Not all of these are true:
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The lot is an existing lot of record
- Lot width is at most 100 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The lot is an existing lot of record
- Lot width is more than 100 ft
- Lot width is at most 150 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The lot is an existing lot of record
- Lot width is more than 150 ft
- Lot width is at most 200 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- Not all of these are true:
- The lot is an existing lot of record
- Lot width is at most 200 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- The lot is an existing lot of record
- Lot width is at most 100 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- All of these are true:
- The lot is an existing lot of record
- Lot width is more than 100 ft
- Lot width is at most 150 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- All of these are true:
- The lot is an existing lot of record
- Lot width is more than 150 ft
- Lot width is at most 200 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- All of these are true:
- Not all of these are true:
- The lot is an existing lot of record
- Lot width is at most 200 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- Not all of these are true:
- All of these are true:
- The front yard abuts an arterial
- The lot is a pipestem lot, or its only access is a shared access facility
- None of these is true:
- The lot is a pipestem lot, or its only access is a shared access facility
- The front yard abuts an arterial
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- The front yard abuts an arterial
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- None of these is true:
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The front yard abuts an arterial
- None of these is true:
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- The lot is an existing lot of record
- Lot depth is less than 150 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- All of these are true:
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- Not all of these are true:
- The lot is an existing lot of record
- Lot depth is less than 150 ft
- The lot is a pipestem lot, or its only access is a shared access facility
- None of these is true:
- The lot is a pipestem lot, or its only access is a shared access facility
- A lot line abuts an R5, R10, R20 or R40 zone classification (the setback along that line)
- Within one-half mile of a major transit stop (RCW 36.70A.681)
- None of these is true:
- Within one-half mile of a major transit stop (RCW 36.70A.681)
- Bedrooms in one unit is at most 1
- All of these are true:
- Bedrooms in one unit is at least 2
- Bedrooms in one unit is less than 3
- Bedrooms in one unit is at least 3
- All of these are true:
- The ADU is detached from the principal structure
- The separation between the principal structure and the ADU is less than 100 linear feet
- The lot is a pipestem lot, or its only access is a shared access facility
- The ADU is created by converting an existing (pre-existing) detached structure
- The lot is a waterfront lot regulated under Title 18S PCC (Shorelines)
- All of these are true:
- Not all of these are true:
- The ADU is detached from the principal structure
- The separation between the principal structure and the ADU is less than 100 linear feet
- None of these is true:
- The ADU is created by converting an existing (pre-existing) detached structure
- None of these is true:
- The lot is a waterfront lot regulated under Title 18S PCC (Shorelines)
- The lot is a pipestem lot, or its only access is a shared access facility
- Not all of these are true:
- Any of these is true:
- The land is divided for sale or lease into lots classified for commercial or industrial uses
- The division is for the development of condominium units under Chapter 64.34 RCW