CE · Commercial enterprise (CE)
Federal Way, WA · FWRC 19.240 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Permanent supportive housing and transitional housing | HomeA ADU— | HomeA ADU— | — | ||
| Emergency housing and shelter | — | — | — | — | |
| Group homes type II | — | — | — | — | HomeH ADU— |
| Group homes type III | — | — | — | — | HomeH ADU— |
| Adult family home | — | — | — | — | Home✓ ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 150 units FWRC 19.240.085 note 2 | |
| Minimum lot size | No limit FWRC 19.240.085 | |
| Maximum residents | The city will determine the maximum number of residents and the number of dwelling units or occupancy rooms or suites permitted in the proposed development FWRC 19.240.180 note 1 | Not set FWRC 19.240.095
for Emergency housing and shelter (group living)2 6 persons FWRC 19.05.010
for Adult family home (group living) |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | 5 ft FWRC 19.240.085 | 20 ft FWRC 19.240.180
for Group homes type II (group living); Group homes type III (group living) |
| Side setback | ||
| Rear setback | ||
| Maximum height | ||
| Maximum stories | Not set FWRC 19.240.180
for Group homes type II (group living); Group homes type III (group living) | |
| Maximum lot coverage | No limit FWRC 19.240.085 | |
| Minimum parking | Determined on a case-by-case basis FWRC 19.240.180
for Group homes type II (group living); Group homes type III (group living) | |
| Minimum open space | The subject property must provide usable open space in a total amount equal to at least 100 sq. ft. per dwelling unit. Developments of five or fewer units are exempt from this usable open space requirement. FWRC 19.240.085 note 11 | Not set FWRC 19.240.095
for Emergency housing and shelter (group living)2; Group homes type II (group living); Group homes type III (group living) |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Binding site plan FWRC 18.20.050 | A | — | — | Minimum lot size Not set FWRC 18.20.010 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- Any of these is true:
- None of these is true:
- Lot is within 5,400 ft of a property with more than three units of permanent supportive housing and/or transitional housing
- Main dwelling units on the lot is at most 2
- None of these is true:
- None of these is true:
- Lot is within 1,000 ft of any other emergency housing and shelter
- Lot is within 1,000 ft of a public school
- The property line is adjacent to a single-family residential zone
- None of these is true:
- The property line is adjacent to a single-family residential zone
- The portion of the structure is within 100 ft of a single-family residential zone
- All of these are true:
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- The portion of the structure is within 100 ft of a single-family residential zone
- None of these is true:
- The portion of the structure is within 100 ft of a single-family residential zone
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- The portion of the structure is between 20 ft and 40 ft from a single-family residential zone
- All of these are true:
- The portion of the structure is between 40 ft and 100 ft from a single-family residential zone
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- All of these are true:
- The portion of the structure is between 40 ft and 100 ft from a single-family residential zone
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- All of these are true:
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- The portion of the structure is between 20 ft and 40 ft from a single-family residential zone
- The portion of the structure is between 40 ft and 100 ft from a single-family residential zone
- None of these is true:
- The portion of the structure is between 20 ft and 40 ft from a single-family residential zone
- The portion of the structure is between 40 ft and 100 ft from a single-family residential zone
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- None of these is true:
- The project gets the extra height approved through the specified review process (criteria in the use chart note are met)
- Bedrooms in one unit is less than 1
- All of these are true:
- Bedrooms in one unit is at least 1
- Bedrooms in one unit is less than 2
- Bedrooms in one unit is at least 2