Sign in

BP · BP (Business Park)

Cheney, WA · CMC 21.36 · Official code

By right: nothing · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Group Living————
HomeH ADU—
Transitional Housing————
HomeH ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot sizeNo limit CMC 21.36.050(A)
Minimum lot widthNo limit CMC 21.36.050(A)
Minimum lot depthNo limit CMC 21.36.050(A)

3. Building standards

StandardValueExceptions
Front setback
  • 2 × building height ft1 CMC 21.36.050(A)
  • 20 ft2 CMC 21.36.050(A)
Side setback
  • 2 × building height ft1 CMC 21.36.050(A)
  • 10 ft3 CMC 21.36.050(A)
  • 20 ft4 CMC 21.36.050(A)
Street side setback
  • 2 × building height ft1 CMC 21.36.050(A)
  • 15 ft3 CMC 21.36.050(A)
  • 20 ft4 CMC 21.36.050(A)
Rear setback
  • 2 × building height ft1 CMC 21.36.050(A)
  • 0 ft3 CMC 21.36.050(A)
  • 20 ft4 CMC 21.36.050(A)
Maximum height45 ft CMC 21.36.050(A); 21.36.050(C)(1)
Minimum parking1 space per resident CMC 21.36.060; 21.40.020(1)
beds in the project ÷ 3 spaces CMC 21.36.060; 21.40.020(1)
for Transitional Housing (group living)
Minimum open space15% CMC 21.36.050(A); 21.36.050(C)(8)(a)

4. ADU standards

Lot

No standards.

Building

No standards.

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short plat CMC 22.26.110(a) A up to 4 CMC 22.08.005 —
Minimum lot size
No limit CMC 21.36.050(A)
Minimum lot width
No limit CMC 21.36.050(A)
Minimum lot depth
No limit CMC 21.36.050(A)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040
Subdivision CMC 22.12.020(a); 22.04.090 H 5 or more CMC 22.08.005 —
Minimum lot size
No limit CMC 21.36.050(A)
Minimum lot width
No limit CMC 21.36.050(A)
Minimum lot depth
No limit CMC 21.36.050(A)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040
Binding site plan CMC 22.27.030(a) A up to 3 CMC 22.27.030(a) —
Minimum lot size
No limit CMC 21.36.050(A)
Minimum lot width
No limit CMC 21.36.050(A)
Minimum lot depth
No limit CMC 21.36.050(A)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040
Binding site plan CMC 22.27.030(b) H 5 or more CMC 22.27.030(b) —
Minimum lot size
No limit CMC 21.36.050(A)
Minimum lot width
No limit CMC 21.36.050(A)
Minimum lot depth
No limit CMC 21.36.050(A)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. The yard abuts a residentially zoned property
  2. None of these is true:
    • The yard abuts a residentially zoned property
  3. All of these are true:
    • The yard abuts another industrial zoning district
    None of these is true:
    • The yard abuts a residentially zoned property
  4. None of these is true:
    • The yard abuts a residentially zoned property
    • The yard abuts another industrial zoning district