Sign in

LI/M · Light industrial/manufacturing district

Carnation, WA · CMC 15.36.030; 15.40.120; 15.48.080 · Official code

By right: nothing · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Secure community transition facilities————
HomeH ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

No standards.

3. Building standards

StandardValueExceptions
Front setback25 ft CMC 15.48.080
Side setback
  • 15 ft1 CMC 15.48.080
  • 30 ft2 CMC 15.48.040(B)
Street side setback10 ft CMC 15.48.080
Rear setback
  • 25 ft1 CMC 15.48.080
  • 30 ft2 CMC 15.48.040(B)
Maximum height
  • 35 ft3 CMC 15.48.080
  • 40 ft4 CMC 15.48.080
Maximum impervious surface75% CMC 15.48.080
Minimum parkingThe city recognizes that the table of parking requirements (Table VI) cannot and does not cover every possible situation that may arise. If the proposed use is not listed in the table of parking CMC 15.72.010(D)

4. ADU standards

Lot

No standards.

Building

No standards.

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision CMC 15.09.020 A up to 4 CMC 15.08.010 —
Minimum lot size
Not read CMC 15.16.050
Subdivision CMC 15.09.020 H
Minimum lots
Not read CMC 15.16.200
—
Minimum lot size
Not read CMC 15.16.220
Binding site plan CMC 15.09.020 A up to 4 CMC 15.09.020 —
Minimum lot size
Not read CMC 15.16.510
Binding site plan CMC 15.09.020 H 5 or more CMC 15.09.020 —
Minimum lot size
Not read CMC 15.16.510

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. None of these is true:
    • The LI/M lot line is a common boundary with a residential district
  2. The LI/M lot line is a common boundary with a residential district
  3. None of these is true:
    • Front yard setback is at least 30 feet
  4. Front yard setback is at least 30 feet