Sign in

Industrial · Industrial (I)

Bremerton, WA · BMC 20.94 · Official code

By right: nothing · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Group residential facility - Class II————
HomeA1 ADU—
Transitional housing————
HomeA ADU—
Permanent supportive housing————
HomeA ADU—
Indoor emergency shelter————
HomeA ADU—
Indoor emergency housing————
HomeA ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum frontage20 ft BMC 20.42.040

3. Building standards

StandardValueExceptions
Front setback
  • 10 ft2 BMC 20.94.060(a)
  • 20 ft3 BMC 20.94.060(a)
Side setback
  • 0 ft4 BMC 20.94.060(b)
  • 10 ft5 BMC 20.94.060(b); 20.50.050(b)(1)(i)
Street side setback
  • 10 ft2 BMC 20.44.010(b)(2); 20.94.060(a)
  • 20 ft3 BMC 20.44.010(b)(2); 20.94.060(a)
Rear setback
  • 0 ft4 BMC 20.94.060(c)
  • 10 ft5 BMC 20.94.060(c); 20.50.050(b)(1)(i)
Maximum height50 ft BMC 20.94.060(f)
Maximum lot coverageNo limit BMC 20.94.060(d)
Maximum impervious surfaceNo limit BMC 20.94.060(e)
Minimum parking0 spaces per unit BMC 20.94.080; 20.48.080(l)

4. ADU standards

Lot

No standards.

Building

No standards.

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision BMC 20.12.090(a)(1)(i) A up to 9 BMC 20.12.080(a); 20.12.040 —
Minimum lot size
Not set BMC 20.94.060
Minimum lot width
Not set BMC 20.94.060
Minimum frontage
20 ft BMC 20.42.040
Formal subdivision BMC 20.12.090(a)(2)(i) H 10 or more BMC 20.12.080(b); 20.12.040 —
Minimum lot size
Not set BMC 20.94.060
Minimum lot width
Not set BMC 20.94.060
Minimum frontage
20 ft BMC 20.42.040
Binding site plan BMC 20.12.090(a)(3)(i) A6
Maximum lots
Not set BMC 20.12.080(c); 20.12.040
—
Minimum lot size
Not set BMC 20.94.060
Minimum lot width
Not set BMC 20.94.060
Minimum frontage
20 ft BMC 20.42.040

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. All of these are true:
    • The facility will not create an operational conflict with the efficiency of large-scale industrial uses
    None of these is true:
    • The site is within 880 feet of a parcel containing an existing residential use
  2. None of these is true:
    • The front lot line abuts, or is across a public right-of-way from, a residential zone
  3. The front lot line abuts, or is across a public right-of-way from, a residential zone
  4. None of these is true:
    • This lot line adjoins the low density (R-10) or medium density (R-18) residential zone
  5. This lot line adjoins the low density (R-10) or medium density (R-18) residential zone
  6. The land division is for a commercial and/or industrial development