Sign in

9TH AVE SW, Puyallup, WA 98371

On MLS · $1,000,000 · 315 days · Redfin ↗

Lots near here →

4.5 ac · 100% outside sensitive areas

196,020 sf · 4.5 ac
Width ≈ 521 ft · Depth ≈ 207 ft
Outside sensitive areas about 196,000 sf
Width and depth are estimated.
County
Pierce County
Parcel ID
0420326014
Assessed land value
$386,900
Assessed building value
$0
Legal
Section 32 Township 20 Range 04 Quarter 21 : L 4 OF SHORT PLAT 82-01-27-0166 EASE OF RECORD OUT OF 2-004 SEG R-1329 PP EMS

Values are from the county assessor.

Jurisdiction
Puyallup
Zone
RS-10 · Low urban density single-family residential zone →

Your lot

Lot area
196,020 sf
Net area
196,020 sf (lot area minus wetland, flood, steep slope)
Frontage
292 ft
Lot width
≈ 521 ft (estimated)
Lot depth
≈ 207 ft (estimated)

✔ You can build (by right)

1 unit
Dwelling, single-familyPMC 20.20.010(1)
Manufactured home, designatedPMC 20.20.010(1)
Only if: The manufactured home is newPMC 20.20.010(1)(a)
2 units
Dwelling, middle housingPMC 20.20.010(12)(b)(i)
3 units
Dwelling, middle housingPMC 20.20.010(12)(a)
Only if: At least one middle housing unit is affordable, as provided in PMC 20.20.022PMC 20.20.010(12)(b)(ii)-(iii)
4+ units
Dwelling, middle housing, up to 4 unitsPMC 20.20.010(12)(a)
Only if: At least one middle housing unit is affordable, as provided in PMC 20.20.022PMC 20.20.010(12)(b)(ii)-(iii)
Cottage housing, up to 8 unitsPMC 20.20.010(12)(a)
Only if: At least one middle housing unit is affordable, as provided in PMC 20.20.022PMC 20.20.021(1); 20.20.010(12)(b)(ii)-(iii)
ADU
ADU with Dwelling, single-familyPMC 20.20.010(11)
ADU with Manufactured home, designatedPMC 20.20.010(11)
Only if: The manufactured home is newPMC 20.20.010(1)(a)
ADU with Dwelling, middle housingPMC 20.20.010(11)
Only if: At least one middle housing unit is affordable, as provided in PMC 20.20.022PMC 20.20.010(12)(b)(ii)-(iii)

Dividing the lot

Subdivision, short
✓ Up to 5 lots · administrative reviewPMC 19.07.100(1)
How 5 lots are counted
✓ Lots: 5 ≤ 9 allowedPMC 19.07.020
✓ Density 4/acre: lot area 196,020 sf allows 18 unitsPMC 20.20.020(2); 20.20.029(1)
✓ New lot area 39,204 sf ≥ 10,000 sf requiredPMC 20.20.020(1)
✓ New lot width 104 ft ≥ 50 ft requiredPMC 20.20.020(3)
✓ New lot frontage 58 ft ≥ 20 ft requiredPMC 20.20.020(12)
✓ Road frontage 292 ft ≥ 250 ft needed (5 lots × 50 ft)PMC 20.20.020(3)
✓ Each new lot of 39,204 sf can hold a home
Subdivision, major
✗ Cannot be divided into 10 lotsPMC 19.08.120
✗ At most 5 lots face the road: 292 ft of frontage, 50 ft eachPMC 20.20.020(3)
Residential lot split
? Up to 2 lots, needs verification · administrative reviewPMC 19.11.020(2)(a)
How 2 lots are counted
✓ Lots: 2 ≤ 2 allowedPMC 19.11.020(2)(a)
✓ New lot area 98,010 sf ≥ 10,000 sf requiredPMC 20.20.020(1)
✓ New lot width 261 ft ≥ 50 ft requiredPMC 20.20.020(3)
✓ New lot frontage 146 ft ≥ 20 ft requiredPMC 20.20.020(12)
✓ Road frontage 292 ft ≥ 100 ft needed (2 lots × 50 ft)PMC 20.20.020(3)
✓ Each new lot of 98,010 sf can hold a home
⚠ Needs to check:
  • Lot area: If a residential lot split results in any lot(s) of a size that would allow for further land division, the property is not eligible for a residential lot split but may be divided under other applicable land subdivision processes (e.g., short plat).PMC 19.11.030(2)(a)
  • The parent lot was itself created through a residential lot splitPMC 19.11.030(2)(b)

Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.

Frontage (lot edge within 50 ft of a road)
82nd St Elocal road292 ft
Outside sensitive areas about 196,000 sf (wetland, flood, mapped stream buffer and slope 40% or more are taken off)
The largest rectangle that fits outside the sensitive areas. Setbacks and review areas are not taken off.
Easy to build: standard foundation, little grading.
Some extra cost: stepped foundation, steeper driveway.
Estimated from public maps. A site study and the permit review set the final area.

Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.

1. Soil on the lot

Foundation very limited · Rain water very limited

2. What it means for a house

Foundation
USDA soil rating for a house foundation · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified use. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
All features and their limits →
4
What USDA found here: 3 limiting features · worst 1.00 → very limited
  • Depth to saturated zoneNo limitWorst1.00Ground water is close to the surface. The soil drains slowly and can get soggy in heavy rain.
    USDA text
    Soils with shallow depth to a water table maybe difficult to reclaim and revegetated. These areas are slow to drain and can become waterlogged and boggy during periods of heavy precipitation.
  • SlopeNo limitWorst0.63Steep ground makes it hard for heavy machines to work.
    USDA text
    Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites.
  • Shrink-swellNo limitWorst0.50The soil swells when wet and shrinks when dry. It can move the foundation and crack floor slabs.
    USDA text
    Excessive shrink-swell in the thickest layer between 25 and 100cm deep can cause building foundations to shift, flooring slabs to crack and roadways to buckle.
Rain water
USDA soil rating for soaking up rain water · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified system. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
All features and their limits →
4
What USDA found here: 4 limiting features · worst 1.00 → very limited
  • SlopeNo limitWorst1.00Sloping ground is harder for machines and needs a changed design. Added water can make the slope slide.
    USDA text
    Soils that are sloping are limited in terms of the stormwater management systems that can be installed. Sloping soils are more difficult to for equipment usage. excessive slope may also be a trigger for mass movement when additional water is added to a part of the landscape.
  • Water movementNo limitWorst1.00Water moves slowly through the soil. The system needs more land, and if water is too slow, it cannot work.
    USDA text
    Soils that cannot transmit water rapidly enough require a larger area of land in order for the installed practice to store and infiltrate 1 inch of rain. At some point, the soil transmits water too slowly to allow a reasonably functioniong system to be installed.
  • WetnessNo limitWorst1.00Ground water comes close to the surface in the wet season.
    USDA text
    Soils having a high seasonal water table are limited for shallow infiltration systems.
  • Vegetation establishmentNo limitWorst0.32After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
    USDA text
    Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.

Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: septic, liquefaction.

Needs a study
On the Puyallup mapmap ↗
On the Pierce County mapmap ↗
On the DNR map: type unknown, not checked in the fieldmap ↗
Land near a mapped stream. The city or county may ask for a stream study before a permit.
On the Puyallup mapmap ↗
Land in or near a mapped landslide. The city or county may ask for a geotech report before a permit.
On the Puyallup mapmap ↗

Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
The map links show each public layer as it is. They can show rows we leave out, like filled wetlands or buffers.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.

Sewer

Inside UGA
yes
Nearest public main
not on our maps (within 500 ft)

Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.

Water

Water system
FRUITLAND MUTUAL WATER COMPANY
Phone
(253) 848-5519

Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.