RHODES LAKE RD E, Bonney Lake, WA 98391
On MLS · $375,000 · 92 days · Redfin ↗
Lots near here →26,092 sf · 99% outside sensitive areas
- County
- Pierce County
- Parcel ID
- 0519053010
- Assessed land value
- $200,200
- Assessed building value
- $0
- Legal
- Section 05 Township 19 Range 05 Quarter 33 POR OF S 1/2 OF SW LY S & W OF RHODES LAKE RD E EASE OF REC SUBD APPROVED BY PALS 11/3/2016 OUT OF 3-007 SEG 2017-0222 DX2/8/17DX
Values are from the county assessor.
- Jurisdiction
- Pierce County
- Zone
- RF · Rural Farm →
Your lot
- Lot area
- 26,092 sf
- Net area
- 25,778 sf (lot area minus wetland, flood, steep slope)
- Frontage
- 529 ft
- Lot width
- ≈ 154 ft (estimated)
- Lot depth
- ≈ 104 ft (estimated)
✔ You can build (by right)
| 1 unit | Detached Single-Family HousingPCC Table 18A.17.020; Table 18A.18.020; Table 18A.19.020; Table 18A.23.020; Table 18A.24.020; Table 18A.26.020; Table 18A.27.020; Table 18A.31.020 ⚠ Needs to check:
|
| ADU | ADU with Detached Single-Family HousingPCC 18A.37.120(A)(1); 18A.37.120(A)(3) ⚠ Needs to check:
Only if: Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is nonePCC 18A.65.050(A)(2) |
✗ Your lot does not meet the zoning requirements
| 2 units | DuplexesPCC Table 18A.17.020; Table 18A.18.020; Table 18A.19.020; Table 18A.23.020; Table 18A.26.020; Table 18A.27.020; Table 18A.31.020 ✗ Lot area 26,092 sf < 435,600 sf required (short 409,508 sf)PCC Table 18A.15.020-2 ⚠ Needs to check:
|
Dividing the lot
| Subdivision | ✗ Cannot be divided into 2 lotsPCC 18F.40.020 ✗ New lot area 13,046 sf < 43,560 sf required (short 30,514 sf)PCC 18A.15.030(B)(3)
|
| Short subdivision | ✗ Cannot be divided into 2 lotsPCC 18F.50.040(E) ✗ New lot area 13,046 sf < 43,560 sf required (short 30,514 sf)PCC 18A.15.030(B)(3)
|
| Large lot division | ✗ Cannot be divided into 2 lotsPCC 18F.50.040(E) ✗ New lot area 13,046 sf < 217,800 sf required (short 204,754 sf)PCC 18A.15.030(B)(3)
|
Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.
| Rhodes Lake Rd E | local road | 299 ft | ||
| 166th Ave E | local road | 230 ft |
Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.
1. Soil on the lot
2. What it means for a house
USDA rates every soil on 3 levels, from best to worst.
The soil is fair for this use. The limits can be overcome or made smaller with special planning, design or building. Expect fair performance and some upkeep.
USDA text
"Somewhat limited" indicates that the soil has features that are moderately favorable for the specified use. The limitations can be overcome or minimized by special planning, design, or installation. Fair performance and moderate maintenance can be expected.
The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
- SlopeNo limitWorst0.16Steep ground makes it hard for heavy machines to work.
USDA text
Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites.
USDA rates every soil on 3 levels, from best to worst.
The soil is fair for this use. The limits can be overcome or made smaller with special planning, design or building. Expect fair performance and some upkeep.
USDA text
"Somewhat limited" indicates that the soil has features that are moderately favorable for the specified system. The limitations can be overcome or minimized by special planning, design, or installation. Fair performance and moderate maintenance can be expected.
The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
- Vegetation establishmentNo limitWorst0.50After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
USDA text
Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.
- SlopeNo limitWorst0.47Sloping ground is harder for machines and needs a changed design. Added water can make the slope slide.
USDA text
Soils that are sloping are limited in terms of the stormwater management systems that can be installed. Sloping soils are more difficult to for equipment usage. excessive slope may also be a trigger for mass movement when additional water is added to a part of the landscape.
- Adsorptive capacityNo limitWorst0.25The soil under the system can hold back only a little of the harmful material in rain water. This reason can make the rating somewhat limited, never very limited.
USDA text
Soils having low adsorption lack the ability to attenuate potentially harmful material.
USDA rates every soil on 3 levels, from best to worst.
The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.
USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified use. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
The use: A standard septic drainfield: pipes that spread water from the septic tank into the soil. Only the soil 2 to 5 ft deep is rated.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Septic tank absorption fields are areas in which effluent from a septic tank is distributed into the soil through subsurface tiles or perforated pipe. Only that part of the soil between depths of 24 and 60 inches is evaluated.
- Filtering capacityNo limitWorst1.00The soil 2 to 5 ft deep drains very fast. Septic water can pass through before it is clean.
USDA text
The soil horizon with the maximum Ksat governs the leaching and seepage potential of the soil. When this rate is high, transmission of fluids through the soil is unimpeded and leaching and seepage may become environmental, health, and performance concern.
- Seepage, bottom layerNo limitWorst1.00The bottom layer drains fast. Septic water can seep away before it is clean.
USDA text
The soil's bottom layer Ksat governs the leaching and seepage potential of the soil. When this rate is high, transmission of fluids through the soil and underlying materials is unimpeded and leaching and seepage may become environmental, health, and performance concern.
- SlopeNo limitWorst0.16Steep ground makes it hard for machines to work. Septic water can seep out on the slope below.
USDA text
Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites. Excessive slope may cause lateral seepage and surfacing of the effluent in down-slope areas.
Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: liquefaction.
Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
The map links show each public layer as it is. They can show rows we leave out, like filled wetlands or buffers.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.
Sewer
- Inside UGA
- no
- Nearest public main
- not on our maps (within 500 ft)
Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.
Water
- Water system
- BONNEY LAKE WATER DEPARTMENT CITY
- Phone
- (253) 261-7404
Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.