1725 MERIDIAN AVE E, Puyallup, WA 98372
On MLS · $400,000 · 228 days · Redfin ↗
Lots near here →19,820 sf · 95% outside sensitive areas
- County
- Pierce County
- Parcel ID
- 0420102019
- Assessed land value
- $413,300
- Assessed building value
- $0
- Legal
- Section 10 Township 20 Range 04 Quarter 22 BEG ON E LI OF CO RD 30 FT E OF SW COR NW OF NW OF NW TH N 106 FT TH E 208 FT TH S 106 FT TH W 208 FT TO BEG EXC THAT POR CYD TO WA STATE DOT PER ETN 4195703 DC08/27/08SK
Values are from the county assessor.
- Jurisdiction
- Edgewood
- Zone
- C · Commercial →
Your lot
- Lot area
- 19,820 sf
- Net area
- 18,772 sf (lot area minus wetland, flood, steep slope)
- Frontage
- 106 ft
- Lot width
- ≈ 106 ft (estimated)
- Lot depth
- ≈ 189 ft (estimated)
✔ You can build (by right)
| 4+ units | Townhouse, up to 20 unitsEMC 18.70.050 Only if: The residential use is part of a mixed-use projectEMC 18.80.080(D) Table 1 note 1 Apartment, up to 20 unitsEMC 18.70.050 Only if: The residential use is part of a mixed-use projectEMC 18.80.080(D) Table 1 note 1 |
✗ Your lot does not meet the zoning requirements
| 1 unit | Live/Work UnitEMC 18.70.050 ✗ Lot area 19,820 sf > 1,815 sf required (1 unit at 24/acre)EMC 18.80.080(D) Work/Live UnitEMC 18.70.050 ✗ Lot area 19,820 sf > 1,815 sf required (1 unit at 24/acre)EMC 18.80.080(D) |
| 3 units | TownhouseEMC 18.70.050 ✗ Lot area 19,820 sf > 5,445 sf required (3 units at 24/acre)EMC 18.80.080(D) |
| ADU | ADU with TownhouseEMC 18.70.050; 18.90.190(D)(2) ✗ Lot area 19,820 sf > 5,445 sf required (3 units at 24/acre)EMC 18.80.080(D) |
Dividing the lot
| Subdivision, short | ✓ Up to 4 lots, no minimum lot size found · administrative reviewEMC 16.03.050 How 4 lots are counted ✓ Lots: 4 ≤ 6 allowedEMC 16.03.020 ✓ New lot frontage 27 ft ≥ 24 ft requiredEMC 18.90.100(C)(2) ✓ Road frontage 106 ft ≥ 96 ft needed (4 lots × 24 ft)EMC 18.90.100(C)(2) ✓ Each new lot of 4,955 sf can hold a home |
| Subdivision, full | ✗ Cannot be divided into 7 lotsEMC 16.04.030(A) ✗ At most 4 lots face the road: 106 ft of frontage, 24 ft eachEMC 18.90.100(C)(2)
|
| Residential cluster development | ? Up to 20 lots, needs verification · public hearingEMC 18.50.035(B)(4) How 20 lots are counted ✓ Each new lot of 991 sf can hold a home ⚠ Needs to check:
|
| Binding site plan | ✗ Cannot be divided into 2 lotsEMC 16.05.050(B) With these choices: up to 4 lots · Division of land for the sale or lease of industrial or commercial propertyEMC 16.05.020; 16.05.050(B) · Division of land that includes land to be created as condominium ownership under Chapter 64.34 RCWEMC 16.05.020; 16.05.050(B)
|
| Binding site plan | ✗ Cannot be divided into 2 lotsEMC 16.05.050(A) With these choices: up to 20 lots · Division of land for the sale or lease of industrial or commercial propertyEMC 16.05.020; 16.05.050(A) · Division of land that includes land to be created as condominium ownership under Chapter 64.34 RCWEMC 16.05.020; 16.05.050(A) ✗ At least 5 lots requiredEMC 16.05.050(A) ✗ std.project.total_unitsEMC 16.05.020; 16.05.050(A)
|
Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.
| Meridian Ave E | highway | 106 ft | ⚠ A new driveway on a state or US highway may need a permit or be limited. |
Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.
1. Soil on the lot
2. What it means for a house
USDA rates every soil on 3 levels, from best to worst.
The soil is fair for this use. The limits can be overcome or made smaller with special planning, design or building. Expect fair performance and some upkeep.
USDA text
"Somewhat limited" indicates that the soil has features that are moderately favorable for the specified use. The limitations can be overcome or minimized by special planning, design, or installation. Fair performance and moderate maintenance can be expected.
The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
- Depth to saturated zoneNo limitWorst0.20Ground water is close to the surface. The soil drains slowly and can get soggy in heavy rain.
USDA text
Soils with shallow depth to a water table maybe difficult to reclaim and revegetated. These areas are slow to drain and can become waterlogged and boggy during periods of heavy precipitation.
- SlopeNo limitWorst0.16Steep ground makes it hard for heavy machines to work.
USDA text
Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites.
USDA rates every soil on 3 levels, from best to worst.
The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.
USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified system. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
- WetnessNo limitWorst1.00Ground water comes close to the surface in the wet season.
USDA text
Soils having a high seasonal water table are limited for shallow infiltration systems.
- SlopeNo limitWorst0.47Sloping ground is harder for machines and needs a changed design. Added water can make the slope slide.
USDA text
Soils that are sloping are limited in terms of the stormwater management systems that can be installed. Sloping soils are more difficult to for equipment usage. excessive slope may also be a trigger for mass movement when additional water is added to a part of the landscape.
- Vegetation establishmentNo limitWorst0.44After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
USDA text
Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.
- Adsorptive capacityNo limitWorst0.20The soil under the system can hold back only a little of the harmful material in rain water. This reason can make the rating somewhat limited, never very limited.
USDA text
Soils having low adsorption lack the ability to attenuate potentially harmful material.
Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: septic, liquefaction.
Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
The map links show each public layer as it is. They can show rows we leave out, like filled wetlands or buffers.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.
Sewer
- Inside UGA
- yes
- Nearest public main
- not on our maps (within 500 ft)
Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.
Water
- Water system
- MOUNTAIN VIEW-EDGEWOOD WATER CO
- Phone
- (253) 863-7348
Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.